Align orders, capacity, materials and deadlines in an executable production plan

Design a connected model for the transaction core, constraint-based planning, inventory, procurement, quality, actuals and management analytics.

55.7558° N37.6173° E
01 / Situation

Which production plan is actually executable under current constraints?

02 / Target state

Orders, capacity, materials, inventory and actual execution are recalculated under agreed rules.

When the route is relevant

Recognisable gaps

01

Planning is fragmented across spreadsheets and systems.

02

Capacity constraints surface too late.

03

Master and production data conflict.

04

Plan-versus-actual analysis does not trigger timely replanning.

Sequence

A route from assessment
to verification

01

Planning model

02

Master-data quality

03

ERP core

04

APS scenario

05

Plan, actuals and evolution

Project criterion

Change must have a source, an owner and a method of verification.

Specific metrics, timing, configuration and architecture are set after assessment and agreement on the baseline.

Questions before starting

Should a product be selected immediately?+

No. First define the management situation, target model and system boundaries.

Can timing be stated upfront?+

Sequence and timing depend on the current landscape, data quality and integration scope.

How is the result verified?+

The criterion, data source and verification rule are agreed before implementation.

The next management step

Request a presentation for your context

The exact route, products and integrations are defined after assessment.